Stop Sinnissippi Solar — Protect Jefferson County Before It's Too Late
The PSC just ruled this project needs no full environmental review — public comments on that determination are due August 28. Docket 9823-CE-100. Make your voice count now →
A grassroots movement of Jefferson County neighbors

Protect Jefferson County
Before It's Too Late

They're calling it a "solar farm." It's a 100 MW industrial power plant — up to 923 acres of arrays planned across the working fields of Watertown, Ixonia & Concord — and three commissioners in Madison decide, not us.

Hundreds
public comments already filed on the docket
3
towns directly in the footprint
0
acres under the developer's control
Free · 30 seconds
The Facts

What's actually being proposed in our backyard

Every number below comes from the developer's own application to the Wisconsin Public Service Commission — Docket 9823-CE-100.1

100 MW
Industrial power plant

A merchant-scale generating facility — not a family farm, not community solar.1

0
Acres under developer control

Land the developer holds rights to across three townships — down from a 2,104-acre study area, still three square miles of our county.1,2

558–923
Acres of solar arrays

558 "primary" acres plus 365 more the developer reserves as "alternative" array sites — plus ~110 acres of substation, roads and gen-tie.1,2

0
Of buried collector cable

34.5 kV circuits trenched under the fields, feeding a new 138 kV substation.1

2027
Construction begins April 2027

In development since 2018; the developer targets an in-service date of December 2028.1,2

3
Towns in the footprint

Towns of Watertown, Ixonia & Concord. Farmington was in the original application and has since been dropped.1,2

Proposed location: Towns of Watertown, Ixonia & Concord — from Pipersville south toward I-94. (Farmington was in the original application and has since been dropped — proof that pressure works.2) View the official project map on the PSC website →
Farm or power plant?

Drag to see what they want to build

Same land. Same horizon. One of these grows food and holds our rural character — the other is up to 923 fenced acres of graded dirt, steel piles and glass. This is what construction actually looks like.

Today · Working farmland Their plan · graded dirt & steel

Once the fences go up, it isn't a farm anymore. Slide to compare.

Why we're fighting

It isn't a farm. It's an industrial power plant on farmland.

Eight documented, evidence-based reasons Jefferson County neighbors are demanding a real seat at the table.

01

They chose our best cropland — on purpose

The American Farmland Trust projects that of ~7 million acres of new U.S. solar by 2040, about 83% could land on agricultural land. Developers hunt flat, dry, cleared fields near power lines — the exact traits that make prime farmland.

American Farmland Trust, "Farms Under Threat 2040" (projection)4

02

Three commissioners decide — not us

Approval rests with three state commissioners in Madison. And under Wis. Stat. § 196.491, because it's a merchant plant selling into the wholesale market, the Commission is barred from even reviewing whether we need the power.

Wis. Stat. § 196.491; WI Legislative Council memos5

03

Neighboring homes lose value

A 2025 PNAS study of 8.8 million home sales and 3,699 solar sites found residential homes within three miles of large-scale solar lost 4.8% of value on average — a "stigma" cost borne by neighbors who never signed a lease.

Chen, Hu & Liu, PNAS 2025 · DOI 10.1073/pnas.24184141226

04

Fenced-off land fragments wildlife

A 2025 review in Renewable & Sustainable Energy Reviews found solar sites drive habitat loss and fragmentation, and perimeter fencing blocks the corridors animals travel. Residents have also flagged bald eagle nesting — a federally protected species — in the project area.

Fleming et al., 2025 · DOI 10.1016/j.rser.2025.115995 · PSC comment record7,3

05

No guarantee it ever farms again

Solar has a ~30-year life, and restoration means removing all below-ground structures, de-compacting soil and restoring drainage tile. Who does that in 2058 if the developer is bankrupt? Decommissioning bonds exist precisely because that risk is real.

Kleinman Center (UPenn); NC DEQ; DSIRE Insight8

06

You don't need THIS land

This isn't solar vs. no solar — it's siting. NREL found U.S. rooftops alone could supply ~39% of the nation's electricity, and the DOE and EPA push solar onto 450,000+ brownfields and landfills. The land to hit clean-energy goals exists. Prime Jefferson County cropland doesn't have to be it.

NREL rooftop assessment; DOE/EPA RE-Powering9

07

Whose hardware ends up on our grid?

The FCC just added foreign-made power inverters to its national-security Covered List (July 2026), citing risks of remote disabling of infrastructure — after Reuters found undocumented communication devices hidden in Chinese-made inverters. Sinnissippi's application names only example equipment, has signed no supply agreements, lists Chinese module makers as candidates — and nothing requires it to disclose country of origin before energizing 100 MW next to our homes.

FCC Covered List action, July 2026; Reuters, May 2025; Sinnissippi CPCN application10,11,12

08

"No significant impact"? Their own report disagrees

The state's preliminary determination says the project needs no full Environmental Impact Statement — yet the same assessment admits construction brings noise, dust and vibration for residents, soil erosion and runoff, and that "some animals may be displaced." Residents have documented numerous bald eagle nesting sites in the project area. An 1,944-acre project deserves the full study. Tell the PSC so — comments are due August 28.

PSC preliminary determination & Environmental Assessment, Aug 2026; docket comment record2,3

The clock is running

This project is decided in Madison — unless we show up

Public comment is our best remaining window. Here's where we are.

2018 — Development begins quietly

Invenergy starts signing landowner leases across the towns.2

Dec 2025 — CPCN application filed

Sinnissippi Solar Energy LLC asks the PSC for a Certificate of Public Convenience and Necessity — Docket 9823-CE-100. A revised application follows in March 2026.1

Spring 2026 — Neighbors push back, and it works

Hundreds of comments flood the docket. The Town of Farmington comes OUT of the project footprint, and the land under developer control shrinks from 2,104 to 1,944 acres. Pressure changes this project.2,3

Aug 2026 — The state says "no significant effects"WE ARE HERE

The PSC's preliminary determination (Aug 4) would let the project skip a full Environmental Impact Statement. Comments on that determination are due Friday, August 28, 2026. This is the window.2

April 2027 — Construction, if approved

Vegetation removal, grading, pile-driving and 25 miles of trenching begin across the project area.1

Dec 2028 — Facility energized

Developer target in-service date. Once built, there is no guarantee the soil is restored to prime cropland.1,2,8

For landowners who signed

Signed a lease? Get independent legal advice.

We do not have a public copy of any landowner lease, and we will not guess what yours says. Only a Wisconsin attorney who has read your signed document can tell you what options, if any, apply to you.

What this page will not do: claim a way out exists, quote a page count, or summarize terms from a private contract we cannot publish. Those statements would not be airtight. Your signed document is the only source that counts.
  • 1
    Locate the copy you signed

    Keep the full document — not a brochure, not a verbal summary, not what a neighbor remembers. If you cannot find it, ask the company in writing for a complete copy and keep that request.

  • 2
    Hire an attorney who represents you — not the developer

    Have independent Wisconsin counsel review your specific agreement before you act, decline to act, or sign anything else. Do not rely on the company's explanation of your paperwork.

  • 3
    Follow only the written advice on your file

    If your attorney identifies a notice, deadline, or other step in your agreement, follow that instruction exactly and keep dated proof. We cannot name those terms from this page.

This is not legal advice. We are a neighborhood coalition. We do not interpret private contracts.

Confidential Utility-scale solar array penned behind tall security fencing

Want a confidential conversation?

If you signed and want to talk with neighbors — without us claiming what your paperwork says — reach out. We can help you find independent counsel. We will not tell you what is in your lease.

About the project

What is Sinnissippi Solar?

  • A proposed 100 MW utility-scale solar power plant1
  • Sited across the Towns of Watertown, Ixonia & Concord in Jefferson County — Farmington was in the original application and has been dropped1,2
  • 1,944 acres under developer control; 558–923 acres of arrays, ~25 miles of buried collector lines, a new 138 kV substation and gen-tie1,2
  • Proposed by Sinnissippi Solar Energy LLC, a subsidiary of Chicago-based Invenergy1
  • Under review by Wisconsin regulators — PSC Docket 9823-CE-1001
  • Because it's a wholesale merchant plant, state law bars the PSC from reviewing whether it's needed5
  • No equipment supply agreements signed — final module & inverter selection comes later, with no country-of-origin disclosure required12
Why residents are concerned

Why we're standing up

  • Conversion of productive prime cropland to industrial energy use for decades
  • Visual impact on homes, roads, and the character of our towns
  • Years of construction traffic, noise and dust on rural roads
  • Unanswered questions about wildlife — including reported eagle nesting3
  • Unanswered questions about archaeological & cultural resources under 25 miles of trenching
  • No guarantee the soil can be restored to farmable condition after decommissioning8
  • Grid-security questions unanswered while federal regulators restrict foreign-made inverters10,11
  • Once constructed, neighbors who never signed still live with the plant — a 2025 PNAS study found residential homes within 3 miles lost 4.8% of value on average6
  • Local control stripped away — state commissioners decide, not our towns5
Key issues

What we're fighting for

1

Protect rural character

Jefferson County's identity is farms, woodlots and open horizons — not chain-link fence and glass as far as you can see.

2

Wildlife & environment

Habitat fragmentation, blocked corridors and protected species deserve real, site-specific study — not boilerplate.

3

Cultural & historical resources

Trenching 25 miles of cable disturbs ground that may hold Native American and historical resources. Survey first.

4

Quality of life

Construction traffic, inverter and substation noise, dust and night lighting — imposed on families who never signed a lease.

5

Property rights & local control

Your biggest investment shouldn't lose value because Madison approved your neighbor's lease. Towns deserve a binding voice.

Agree with even one of these?

Then you belong in this fight. It takes 30 seconds to add your name.

Sign the petition
Get involved

Three ways to make a real difference this month

Contact decision makers

File a comment on PSC Docket 9823-CE-100 by August 28, then write your town board, county supervisors, legislators and the DNR. We built you the full directory — every name, phone and link.

Open the contact directory →

Attend meetings

Town board, county Planning & Zoning, and the upcoming PSC public hearings. A full room changes outcomes — we'll tell you when and where.

Get meeting alerts →

Volunteer

Host a yard sign, knock doors, gather petition signatures or help with research. Every hour moves the needle.

Raise your hand →
Contact the decision makers

Every official who can influence this — one list

Start with the PSC comment: that's the official record the commissioners must read. Then make it personal — your town board and legislators answer to you.

File your public comment — due Friday, Aug 28

Docket 9823-CE-100 · Case coordinator: Kathleen Panak · Environmental review coordinator: Samuel Rumschlag · PSC main line (608) 266-5481

Comment on the docket

Washington

Your federal delegation
Sen. Tammy BaldwinUS Senator (WI)
baldwin.senate.gov/contact · (608) 264-5338
Sen. Ron JohnsonUS Senator (WI)
ronjohnson.senate.gov/contact · (202) 224-5323
Rep. Scott FitzgeraldUS House, WI-05 — covers all of Jefferson County
fitzgerald.house.gov/contact · (262) 784-1111
Ask them: why is a 100 MW plant allowed to energize with no country-of-origin disclosure on its grid equipment?

Madison

Your state legislators — find yours by town
Town of WatertownSen. John Jagler (SD 13) · Rep. William Penterman (AD 38)
Jagler (608) 266-5660 · Penterman (608) 237-9138
Town of IxoniaSen. Chris Kapenga (SD 33) · Rep. Barbara Dittrich (AD 99)
Kapenga (608) 266-9174 · Dittrich (608) 237-9199
Town of ConcordSen. Chris Kapenga (SD 33) · Rep. Cindi Duchow (AD 97)
Kapenga (608) 266-9174 · Duchow (608) 237-9197
Ask them: why does Wis. Stat. § 196.491 bar the PSC from even asking whether we need this power?

Town of Watertown

Town board & clerk
John ThomaTown Chairman
(920) 988-8744
Town HallN8302 High Road, Watertown
townofwatertownwi.gov · (920) 261-5690

Town of Ixonia

Town board & clerk
Brian DergeTown Chairman
[email protected] · (262) 269-9732
Town HallW1195 Marietta Ave, Ixonia
townofixonia.wi.gov · (920) 261-1588

Town of Concord

Town board & clerk
Ted MuellerTown Chairperson
(920) 988-2583
Brian NeumannTown Clerk
[email protected] · (414) 534-4220
Town HallW1095 Concord Center Dr, Sullivan
concordwisconsin.org

Jefferson County

County Board of Supervisors
Steven J. NassBoard Chair (District 15)
[email protected] · (920) 648-8513
Your district supervisorIxonia — Bruce Degner (D9) · Concord — Mark Groose (D10) · Town of Watertown — Robert Preuss (D3)
Full board roster & district map
Ask every supervisor where they stand — and ask them to publicly disclose any financial interest, lease or payment tied to this project.

Wisconsin DNR

Co-reviewer of the environmental assessment
Office of Energy ProjectsCoordinates DNR's review of PSC energy projects
dnr.wisconsin.gov — Energy · 1-888-936-7463
Stacy RoweEndangered Resources review
[email protected]
Ask them: with documented bald eagle nesting in the area and their own assessment admitting animals will be displaced, why does 1,944 acres not merit a full Environmental Impact Statement?
This is the moment

Once the fences go up,
they don't come down.

The Public Service Commission is weighing this project right now. Your name, your comment, and your presence at one hearing may be the difference for the next generation of Jefferson County.

Petition + hearing alerts
Sources & citations
  1. Public Service Commission of Wisconsin, Docket 9823-CE-100 — Sinnissippi Solar Energy Center case page, CPCN application filed Dec 2025 (revised application accepted Mar 2026, PSC REF# 582739) (psc.wi.gov; full docket: apps.psc.wi.gov).
  2. Watertown Daily Times (2026) — "Public Service Commission issues preliminary determination on Sinnissippi Solar project" (Aug 4, 2026: preliminary "no significant environmental effects" determination; 1,944 acres under development rights; 558 primary + 365 alternative array acres; comments due Aug 28, 2026); "Sinnissippi Solar presents at Wake Up Watertown" (Jul 1, 2026); "Solar feedback: PSC fields hundreds of public comments" (May 19, 2026). Current footprint reported as Towns of Watertown, Ixonia & Concord — Farmington, included in the original application, no longer appears (wdtimes.com).
  3. PSC Docket 9823-CE-100 public comment record — hundreds of public comments from Jefferson County and across Wisconsin on prime agricultural soils, reported bald eagle nesting sites, and soil-restoration / decommissioning uncertainty (Watertown Daily Times / GazetteXtra, May 19, 2026).
  4. American Farmland Trust, "Farms Under Threat 2040" — utility-scale solar white paper (2022): projection that ~7M acres of new U.S. solar by 2040, ~83% could site on agricultural land (farmland.org).
  5. Wis. Stat. § 196.491 (CPCN / wholesale merchant plant), with Wisconsin Legislative Council Information Memos IM-2024-01 & IM-2025-02 (docs.legis.wisconsin.gov).
  6. Chen, Hu & Liu, "Impact of large-scale solar on property values in the United States," PNAS (2025) — DOI 10.1073/pnas.2418414122. Residential homes within 3 miles: avg −4.8%.
  7. Fleming et al., "All that glitters — Review of solar facility impacts on fauna," Renewable & Sustainable Energy Reviews v224 (2025) — DOI 10.1016/j.rser.2025.115995.
  8. Kleinman Center for Energy Policy (Univ. of Pennsylvania), "Regulating Utility-Scale Solar Projects on Agricultural Land"; NC Dept. of Environmental Quality, Utility-Scale Solar Decommissioning Program; DSIRE Insight (2023) on decommissioning bonding.
  9. NREL, "Rooftop Solar PV Technical Potential in the United States" (NREL/TP-6A20-65298, 2016) — rooftops ≈ 39% of U.S. electricity; U.S. DOE & EPA RE-Powering, solar on brownfields & contaminated/disturbed lands.
  10. FCC Public Safety & Homeland Security Bureau — foreign-produced power inverters added to the Covered List under the Secure Networks Act framework, July 28, 2026, citing risks of remote disabling of infrastructure, data exfiltration and cyberattack; new equipment authorizations barred (existing authorized models grandfathered) (fcc.gov/supplychain/coveredlist; analysis: Morgan Lewis, Aug 3, 2026).
  11. Sarah McFarlane, "Ghost in the machine? Rogue communication devices found in Chinese inverters," Reuters, May 14, 2025 (reuters.com) — undocumented communication devices, including cellular radios, found in some Chinese-made inverters and batteries. See also: Deye's November 2024 remote disabling of its US-installed inverters from China; Sens. Scott & Blackburn letter to Commerce on a potential grid "kill switch" (Jun 2025); letter from 50+ US House members urging a halt to Chinese inverter imports (Nov 2025, Solar Power World).
  12. Sinnissippi Solar CPCN application, §1.5.2 & §2.2.5 and Appendix B Equipment Datasheets (PSC ERF REF# 582739 & 569798) — equipment identified as representative/example only; "No solar module supply agreements have been executed"; final module, inverter and tracker selection deferred to procurement; module candidates listed include JA Solar, Jinko and LONGi (Chinese-headquartered) alongside Illuminate USA; no country-of-origin disclosure requirement.

Photography licensed for commercial use via Unsplash & Pexels (no attribution required); images are illustrative of utility-scale solar and Midwest farmland, not the Sinnissippi site itself.